Lab
Lab
Builds in motion. An entry appears here only when it carries all three fields: the date it was measured, the artifact that proves it, and the next milestone with a date on it.
In motion
Three fields or no entry. An entry the build cannot date, point at, and give a next step to is not written down. Entries older than sixty days are flagged stale, and the publish gate refuses a stale entry rather than letting it sit.
2026-08-23
Transcript retrieval — promotion gate, round two
ArtifactPath class <transcript-intel>/eval/ — the graded query set, the swept parameters and the gate result for both backends. Corpus: 12,171 deduplicated calls across 3,652 tickers.
Next milestone2026-09-30 — publish the guidance-ledger schema and the first quarter-over-quarter tone delta from that corpus.
2026-06-28
Equity workbench — static report build
ArtifactPath class <equity-workbench>/report/dist/ — the built static report, produced by deterministic code with language models used only at the edge to draft prose.
Next milestone2026-09-15 — render pass over the report template, then a second ticker built from the same pipeline without hand edits.
2026-08-23
Forensic research — re-verification after withdrawal
Artifacthttps://thekinghippopotamus.github.io/ForensicAnalysis/ — the withdrawn campaign's pages, held rather than deleted, each carrying a banner that says so and loading no third-party resource.
Next milestone2026-09-30 — publish the rebuilt methodology page: the coverage contract, the gap taxonomy, and the rule that a gap with no logged attempt blocks publication.
Author approval — 2026-08-23, hash 7eed5ad6